WEB1504/22
The development consists of: 1. Removal of the existing glazing structure at the first floor rear extension. 2. Demolition of the existing first floor rear extension. 3. Removal of the existing flat roof serving the ground floor rear extension to be replaced with a new lean to roof incorporating a skylight. 4. Construction of a flat roof rear extension on the first floor to consist of an office and a bathroom. 6. Construction of a gable ended pitch roof to the main house for the provision of an attic conversion with a rear facing flat roof dormer window to consist of a master bedroom, walk-in wardrobe and ensuite . 7. General remodel and partial upgrade of the existing dwelling at both ground floor & first floor to suit the proposed layouts. 8. All drainage, structural and associated site works to be implemented.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.