To (1) demolish existing semi-runious seaweed factory (2) permission to construct four holiday glamping pods (3) permission to construct reception building with men and women toilet and shower facilities which will service the glamping pods (4) new wastewater treatment system with polishing filter (5) alterations to existing site entrance as well as all ancillary site works and site services.This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works 173.50 sqm
Core Refusal Reason
The development was refused due to potential adverse impacts on the Slyne Head Peninsula Special Area of Conservation (SAC) and the absence of a required archaeological and cultural heritage impact assessment.
Decision Maker's Conclusion
- The planning authority is not satisfied that significant negative effects on the integrity and conservation objectives of the Slyne Head Peninsula SAC can be ruled out, specifically regarding Annex I habitats.
- The submitted Natura Impact Statement (NIS) contained significant lacunae, including substandard mapping and unclear mitigation measures for direct impacts on European Dry Heath.
- The absence of an archaeological and cultural heritage impact assessment (ACHIA) renders the proposal contrary to the heritage policies of the County Development Plan.