ERECTION OF 12 HORSE STABLES WITH ALL ANCILLARY AREAS, A STORAGE AREA, AN OUTDOOR ARENA, A PADDOCK AND A DRY SHED WITH CONNECTION TO EXISTING SERVICES INCLUDING A PROPOSED ACO QUADRACEPTOR SURFACE WATER RUN-OFF FILTRATION SYSTEM