4518/22

The development will consist of the construction of an additional floor of office accommodation and associated facilities at third floor level, set back from the existing front and side elevations. The new roof is to have a sedum finish, with all existing rainwater goods to be replaced. The front elevation is to be glazed, and the side and rear elevations are to be rendered to match existing.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.