4607/22
The proposed development will consist of amendments to the previously permitted development granted under Dublin City Council Reg. Ref. 2421/20 and An Bord Pleanála Reg. Ref. ABP-309400-21. The proposed amendments include reconfiguration of the permitted development as follows: (i) Basement Level: Reconfiguration of the shape and structure of the basement level from that permitted, resulting in a reduction of the proposed area by c. 48.65 sqm to an overall c. 326.58 sqm. (ii) Ground Floor Level: Reconfiguration of the permitted ESB Substation/Switchroom (c. 14 sqm) to a Double Substation (c. 27.74 sqm) resulting in a relocation of the associated doorways to the north elevation onto Dame Lane; relocation of the main entrance doorway; reduction in the area for the permitted Restaurant from c. 447.8 sqm to c. 375.92 sqm; change of use of part of the permitted Office area to Café/Reception area c. 74.14 sqm. (iii) First to Eight Floor Levels: Reconfiguration of the internal core area to accommodate a unisex WC arrangement; an increase of the office areas on these floors by a total of c. 174.4 sqm; minor changes to the external façade to facilitate. (iv) Roof Level: Reconfiguration of the proposed roof level plant area to align with Passivhaus compliance, including the provision of 2 no. high efficiency Air Handling Units, resulting in a minor increase in height to c. 36.279m above ground (44.129m ODM, including lift overrun). (v) All associated site development works.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.