SD22A/0124

Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.