2260955

of a new CT suite and associated rooms and includes the completion of a new build floorspace within the footprint of an existing ground floor undercroft to the west side of the hospital. The project incorporates an associated roof top plant room required to service the new CT suite, the plant room is located at second floor level above the first floor ICU. The works include drainage works to connect to the existing building and all ancillary site works. Gross floor space of work to be retained: 636.00 sqm

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.