26114

Retain (A) infill entrance lobby and external porch to front of dwelling house; (B) Retain additional floor area as constructed to sunroom at south eastern side of dwelling with associated elevational changes; (C) Retain Extension projection to First Floor Bathroom as constructed to rear of dwelling house; (D) Retain dormer window elevational changes to front and gable windows to south eastern and north western elevations of dwelling; and Permission to decommission the existing septic tank and to install a mechanical treatment system and raised polishing filter all with associated works

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.