21869

Part 8 - Process for the Bray Sustainable Transport Bridge Project - The proposed bridge and link road will consist of a two-lane public transport road 3.25m wide and variable width pedestrian, cyclist and shared path facilities. A new pedestrian boardwalk is proposed along the southern bank wall to link the existing walkway to the bridge crossing

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.