211445

for the construction of a new warehouse building to include for Warehouse Storage Space, Transit Bond, Loading and Unloading facilities, Meeting Rooms, Staff Rooms, WC's. Offices, Reception with External logo signage on selected elevations having a total floor area of 11,387.2 sqm comprising of the following: - Ground Floor - 6578.6 sqm - First Floor level - 2357.3 sqm - Second Floor level - 2451.3 sqm - The building footprint will include warehouse spaces, transit bond, loading, meeting room, staff rooms, WC's, Offices, Reception, and an External elevation logo signage etc. - Construction of a new 32 sqm ESB MV sub-station and all other service and ancillary site infrastructure required to operate the premises. -Construction of a 19m long (66sqm) Link bridge connecting the existing facility to the proposed new facility on the 1st Floor. - The provision of a new public lighting scheme in the vicinity of the proposed building, a building mounted CCTV system, new car parking facilities, hard and soft landscaping to the remainder of the site area, boundary treatments; Drainage infrastructure and connections to services/utilities; Relocation of the existing ESB power lines and the construction of a new EXB MV sub-station along with all other associated and ancillary development works above and below ground level that are required to complete the project to the required standards and regulations. Gross floor space of proposed works is 11,387.2 sqm

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.