permission (total c.0.4ha.) consisting of rock extraction (c.0.2ha) and sand and gravel extraction (c 0.2ha) outside of the existing permitted extraction areas under P. Reg. Ref 93/607 and Section 261A Substitute Consent (ABP Ref SU0026).