PP - development consisting of a renewable energy development on a 3.9 hectare site. The proposed development will constitute the provision of the following: Construction of a Biomass processing and storage area utilising forestry products. Construction of a Gasification and Methanation Plant including buildings for the production of advanced biofuels. Construction of a Gasification and Combined Heat Power Plant including building for the production of electricity and heating. Construction of Containerised Battery Storage Facility (20MW). Construction of a Thermal Energy recovery and storage facility including buildings for district heating distribution. Construction of two on-site 38kV substations. Creation of a new access from Finisklin Road. All ancillary development , including the provision of site office, car parking, internal access roads, perimeter landscaping, fencing, lighting, and on-site drainage. The Planning application is accompanied by a Natura Impact Statement.

Refused

Core Refusal Reason

The application was refused primarily due to insufficient information regarding environmental risks—specifically leachate and gas emissions—associated with developing on a closed landfill, which prevented the Planning Authority from ruling out adverse impacts on protected European sites and local water quality.

Decision Maker's Conclusion

  • The Natura Impact Statement (NIS) failed to provide enough information to ensure the development would not adversely affect the integrity of the Cummeen Strand/Drumcliff Bay SAC and Cummeen Strand SPA due to potential landfill-related emissions.
  • The applicant did not demonstrate a satisfactory plan for surface water management, posing an unacceptable risk of environmental pollution to surface, ground, and marine waters.
  • The proposed development is considered premature as it precedes the completion of necessary remediation measures required to address existing environmental contamination risks at the closed Finisklin landfill site.

Cited Policies (CDP)

P-WM-14O-WM-6O-WM-1P-WM-5P-WM-6P-CAM-1P-CAM-4P-CAM-5P-CAM-8P-CAM-10SP-EN-1SP-EN-2SP-EN-3SP-EN-4SP-EN-5SP-EN-6SP-EN-7

Decision Document Summary

Carbon Sole Group Ltd. proposed a large-scale renewable energy development at Finisklin, Co. Sligo, featuring biomass processing, gasification, and battery storage on a 3.9-hectare site situated on a closed landfill. Sligo County Council refused the application on the grounds that the proposal failed to adequately address the complex environmental constraints of the site. The decision highlighted significant gaps in the Natura Impact Statement regarding leachate and gas migration, a lack of robu...