(A) CONSTRUCT A CANTILEVER ROOF CANOPY WITH 4 NO. FIXED ROOF WINDOWS ON THE REAR FACADE (WEST) OF BUILDING, (B) THE INSTALLATION OF A STOVE UNDER THE EXISTING ARCHWAY CONNECTED TO A NEW STEEL FABRICATED EXTERNAL FLUE PIPE ON THE NORTH GABLE