DEVELOP A PRE-FABRICATED ELECTRICY SUB-STATION. THE SUB-STATION IS REQUIRED FOR CONNECTION OF THE ELECTRIC VEHICLE CHARGING HUB TO THE LOCAL ESB NETWORKS POER SUPPLY GRANTED UNDER PLANNING REG. NO. 20157 AND ALL ASSOCIATED SITE WORKS