21859
for an off-grid renewable energy farm consisting of 1092 no. low level solar panel array with maintenance access drive, 1 no. single storey office & workshop building (139.98m2), 1 no. single storey storage building (60.3m2), 4 no. hydrogen storage tanks (c.24m3/unit), 4 no. containers for plant equipment (14m2/unit), 2 no. underground water harvesting tanks, 1 no. stormwater retention pond with timber pontoon structure, and proposed tarmac driveway with footpath from the existing entrance, fences, security kiosk, parking spaces, landscaping, waste water treatment system with soil polishing filter and all associated site and other works
Core Refusal Reason
The application was refused due to a lack of critical technical information, non-compliance with previous planning conditions, and inconsistency with the County Development Plan's strategy for industrial location and environmental protection.
Decision Maker's Conclusion
- The proposal is considered premature and contrary to proper planning due to the applicant's failure to comply with previous entrance permissions and the ongoing investigation into unauthorized waste disposal on the site.
- The development lacks essential technical detail regarding the hydrogen production process, risk assessments for neighboring dwellings, traffic impact assessments, and adequate fire safety measures.
- The project is inconsistent with the Kilkenny County Development Plan 2021-2027, specifically regarding the location of non-agricultural industries and the protection of sensitive ecological habitats and Natura 2000 sites.