(1) DEMOLISH THE TWO EXISTING FARM SHEDS ON THE SITE (2) CONSTRUCT A DWELLING HOUSE, SEPTIC TANK AND PERCOLATION AREA INCLUDING ALL NECESSARY SITE WORKS