22228

CONSTRUCT A BIOGAS PRODUCTION PLANT INCORPORATING: TWO DIGESTION TANKS, A PRE-MIX TANK AND DIGESTATE TANK, A SUBSTRATE STORAGE AREA AND SLURRY STORAGE TANK WITH ASSOCIATED PUMPS, TO CONSTRUCT A BUILDING CONTAINING CHP UNIT AND CONTROLS FOR DIGESTION FACILITY AND MACHINERY STORAGE, A CONCRETE UNDERGROUND COVERED SOILED WATER TANK WITH WHEEL WASH, WEIGHBRIDGE, AND BIOGAS FARE UNIT, TO CONSTRUCT A WATER ATTENUATION TANK FOR STORM/RAIN WATER ON SITE, COMPLETE WITH CLASS 1 OIL INTERCEPTOR/SEPARATOR, SILT TRAPS, TREE LINED BOUNDARY FENCE ON EARTHEN BANK AND ALL SSSOCIATED SITE WORKS

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.