2261105

to construct and complete a solar pv energy development with a total site area of circa 24.51 hectares, to include electrical transformer and inverter station modules, solar pv panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, cctv and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works, the solar farm would be operational for 35 years, access will be gained from a private lane off the l-7117 to the northeast, this access point and part of the internal access track is within the red line boundary of the consented ballymoneen solar farm application (planning ref: 20/961).Gross floor space of proposed works 768.00sqm.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.