21633
Recommencement of processing using the exiting crushing, screening and washing plants and associated ancillary infrastructure which was regularised by way of a grant of substitute consent (ABP ref. SU0026). Retention of the existing concrete batching plant (with a maximum overall height of 17m) and associated ancillary infrastructure. Retention of the existing asphalt plant (with a maximum overall height of 22.7m) and associated ancillary infrastructure, which replaced the asphalt plant previously granted permission under planning ref 99/967. Importation to site of up to 100,000 tonnes per annum of aggregate materials for use in the concrete batching and asphalt plants and all within a planning application area of 4.6 hectares.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original