21717
Permission for development consisting of the extraction and processing of limestone aggregate (quarry extraction area of 4.3 Ha.) to a depth of 83mOD, for a 10 year period and all ancillary activities within an application area of 5 Ha. (a Natura Impact Statement has been prepared in respect of the planning application) at
Refused
Core Refusal Reason
The application failed to provide sufficient technical information to demonstrate that the development would not adversely impact the local road network, water quality, and community amenities.
Decision Maker's Conclusion
- The proposal lacks adequate detail regarding surface water management and effluent disposal, posing a potential risk to the Owennaforeesha River and local groundwater systems.
- The existing R369 regional road and adjacent bridge are insufficient in width and structural capacity to safely accommodate the high volume of HGV movements associated with the quarry.
- The assessment of environmental impacts is incomplete, specifically concerning the effects of blasting noise and vibration on the nearby local national school and the adequacy of dust suppression measures.
Cited Policies (CDP)
Section 3.4.4Chapter 9Section 9.34Policy 3.54Policy 3.58Policy 3.60
Decision Document Summary
Hubert Maxwell sought a 10-year permission for a limestone aggregate quarry and processing facility on a 4.3-hectare extraction site at Drummin, Peak, Tullaghan, and Gortnagoyne, Co. Roscommon. The site is located near Bellanagare village in a landscape of 'Moderate Value' near the Breedoge River. The Planning Authority determined that the proposal was deficient due to significant concerns regarding road safety on the R369, potential contamination of local watercourses from inadequate drainage p...SOURCE PDFOpen Original