a deposition area for surplus fill material (inert soil and subsoil) on a 3.92 hectare site and will have a consequential agricultural benefit. This development also requires a certificate of registration and an application will be made to Westmeath County Council

Refused

Core Refusal Reason

The proposed development is located within a designated flood plain of the River Brosna, where the filling and raising of land levels would remove natural water attenuation and increase flood risk to downstream areas.

Decision Maker's Conclusion

  • The site is situated within a designated flood risk area as identified by the Office of Public Works and draft CFRAMS mapping.
  • Raising the ground levels would result in the loss of natural flood attenuation, potentially funnelling additional water downstream toward Mullingar town and the Springfield tunnel.
  • The proposal lacks a required Ecological Impact Assessment to address potential adverse impacts on protected European sites (Lough Ennell SAC/SPA) connected via the River Brosna.

Cited Policies (CDP)

Westmeath County Development Plan 2021-2027Chapter 5 Economic Development and EmploymentChapter 9 Rural Westmeath

Decision Document Summary

Sheever Developments Ltd proposed the creation of a deposition area for approximately 28,412 tonnes of surplus inert soil and subsoil on a 3.92-hectare agricultural site at Robinstown, Mullingar. The site is characterized as low-lying land adjacent to the River Brosna and is located within a designated flood plain. Westmeath County Council refused permission because the proposed land-raising would compromise natural flood attenuation and increase the risk of flooding in downstream urban areas. A...