2253
CONTRUCT THE FOLLOWING (1) NEW ESB SUB-STATION WITH ANCILLARY DRAINAGE ON THE EASTERN SIDE OF THE THEIR EXISTING INDUSTRIAL FACILITY AND (2) TWO NO. PERSONNEL DOORS AND ONE NO. ROLLER SHUTTER DOOR ON THE NORTH WESTERN ELEVATION OF THEIR EXISTING INDUSTRIAL FACILITY ALL LOCATED AT THEIR FACILITY
No decision recorded
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.