2265

for development at the existing facility at Building 2, East Park, Smithstown, Shannon, Co Clare. The development will consist of: Installation of a 13MW solar photovoltaic system on the roofs of the Zimmer Biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. inverters and 2 no. 1.04MWh Batteries. Installation of a back-up generator. Installation of 2 no. transformers. All ancillary development including the construction of supporting concrete plinths, perimeter palisade fencing, electrical cabling, on-site drainage and the relocation of an existing storage unit

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.