(A) RETAIN EXISTING ELEVATIONAL CHANGES (B) RETAIN PORCH AND GABLE SIDE/REAR EXTENSIONS (C) RETAIN ATTIC CONVERSION (D) THE DECOMMISSIONING OF EXISTING SEPTIC TANK AND THE INSTALLATION OF A NEW WASTEWATER TREATMENT UNIT AND PERCOLATION AREA (E) ALL WITHIN REVISED SITE BOUNDARIES