Permission for development which will consist of 1. The drilling of 18 no. geothermal boreholes. 2. Ground excavation works to facilitate a pipeline system connecting the boreholes to a heat exchanger unit located inside the Alice Perry Engineering Building. 3. The installation of a Dry Air Heater (DAH) unit on the roof of the Alice Perry Engineering Building. 4. All associated and ancillary site works. A Natura Impact Statement is included with this application

Granted
Analysis not available for this case.