228001
the construction of 1 no. cattle overpass on the newly developed Limerick Greenway for the provision of livestock crossing of the Greenway. The overpass will consist of a concrete culvert above the Greenway surface to allow cattle crossing and to maintain the safety of pedestrian and cyclist users of the Greenway. The existing level of Greenway surface will be retained
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.