22406
to construct and complete a Solar PV Energy development with a total site area of circa 25 hectares, to include electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabin and ducting. CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works. The solar farm would be operational for 35 years. Gross floor space of proposed works: 768 sqm
Core Refusal Reason
The proposal materially contravenes a condition of a previous planning permission (Pl. Ref: 20/961) and fails to demonstrate adequate control over essential access and drainage infrastructure located outside the planning unit.
Decision Maker's Conclusion
- The development would materially contravene Condition 1 of planning reference 20/961 by proposing solar panels in the specific area previously approved for an energy storage facility.
- The applicant failed to demonstrate that essential components, including site access and surface water drainage infrastructure, can be adequately provided and maintained as they are located outside the red line boundary of the planning unit.
- The proposed development would result in a substandard form of development that endangers public safety by reason of traffic hazard and contravenes Policy Objective WW7 regarding Sustainable Drainage Systems.