22137
for: 1) The construction of one Enercon 115 wind turbine on a 92m tower with an electrical rating of 4.2MW and an overall tip height of 149.86m; 2) The construction of the wind turbine foundation, hardstanding and assembly area; 3) Provision of a site entrance and an access track within the site; 4) Construction of an on-site 20kV substation and underground electrical cable; and 5) All associated site development and ancillary works Significant further information and revised plans has been submitted.
Granted
Analysis not available for this case.