22475
the development will consist of (i) a new above-ground treated water reservoir on top of an earthen embankment with associated connection, scour and overflow pipework; (ii) a control building housing a secondary chlorination facility and welfare facility, together with all associated and ancillary works; (iii) an attenuation pond; (iv) solar panels on the roof of the proposed reservoir, the roof of the proposed control building, and the roof of the existing earthen embankment rectangular reservoir; and (v) all ancillary development including entrance on to the public road, groundworks, security fencing, lighting, landscaping, SuDS drainage system and mechanical and electrical service connections
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.