22326
for demolition of a portion of the existing 20th Century rubble stone boundary wall of approximately 30 metres long and c. 2.5m high. Reconstruction of the boundary wall in rubble stone to new alignment to enclose a portion of the existing footpath to the south west of the current school boundary. This area of footpath totals 62sqm and is currently in the control of Waterford City and County Council. Construction of a single storey building with flat roof of 30 sqm to house a new ESB Sub Station and electrical switch room. The existing pedectrian entrance to the school will be reinstated in the new stone wall. The works include drainage and associated site works. The proposed works are in the curtilage of Newtown School which is on the Record of Protected Structures