(A) DEMOLISH EXISTING SHED (B) DESLUDGE AND DECOMMISSION EXISTING SEPTIC TANK (C) CONSTRUCTION OF NEW SEPTIC TANK AND PERCOLATION AREA (D) ALTERATIONS TO EXISTING DWELLING WHICH INCLUDE RAISED RIDGE LEVEL, NEW THATCH ROOF AND ELEVATIONAL CHANGES (E) ASSOCIATED SITE WORKS