22556
development consisting of; - widening of existing site entrance which includes removal of the existing gate, wall and gate pier, removal of existing evergreen trees and perimeter fence, - widening of existing entrance road, new concrete footpath, new tactile paving, - proposed perimeter paladin fence - proposed pedestrian gate, railings, concete steps, landing and bollards, - proposed sliding gate system, - proposed rendered blockwork wall, pier, capping and signage, - relocation of existing flag pole, - partial relocation of previously granted walking track, - proposed pedestrian crossing, line markings, and all associated site works
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.