22568
to a) regularise the demolition of the prefabricated staff unit and b) to RETAIN the construction of the new staff unit along with associated external works and services. The development is located within the existing footprint of Ennis Hospital where there are a number of existing protected structures. External lead flashing works were carried out to the protected structure (RPS 800 Hospital c. 1934-1940). This proposed development is within the curtilage of the protected structure (RPS 800 Hospital c. 1934-1940)
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original