SINGLE STOREY PROCESS BUILDING OF 13.3M HEIGHT; 16 NO. FIN FAN COOLERS OF 6.9M HEIGHT; HYDROGEN STORAGE AREA WITH AREA OF 4650M2; GAS INJECTION COMPOUND WITH AREA OF 1000M2; 2 NO. GAS AGI BUILDINGS, EACH OF 3M HEIGHT; ELECTRICAL SUBSTATION WITH AREA OF 2407.6M2; 2 NO SUBSTATION BUILDINGS, EACH OF 4M HEIGHT; RAW WATER AND FIRE WATER STORAGE TANK WITH VOLUME OF 879.6M3; PUMP HOUSE OF 5M HEIGHT; WATER ABSTRACTION CHAMBER WITH VOLUME OF 2.9M3; RESURFACING, REPAIR AND IMPROVEMENT OF EXISTING SITE ENTRANCE; REPLACEMENT BRIDGE; INTERNAL ACCESS ROADS AND ASSOCIATED GRID CONNECTION WORKS WITHIN THE L52925 PUBLIC ROADWAY. THE DEVELOPMENT WILL INCLUDE THE PROVISION OF 12 NO. PARKING SPACES, FOOTPATHS, LANDSCAPING, FENCING AND ALL OTHER ASSOCIATED SITE DEVELOPMENT PLANT AND EQUIPMENT AND OTHER WORKS INCLUDING SURFACE WATER AND FOUL WASTEWATER DRAINAGE INFRASTRUCTURE WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 6.51HA

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.