22224
for PL16/384 for the construction of proposed dwelling within an existing unfinished housing development and completion of same. The proposed development (21 no. housing units in total) shall consist of 2 no blocks of 4 no. three bedroom dwellings, 2 no. single storey dwellings, 1 no block of 3 no. two-storey three bedroom dwellings, 8 no. two-storey three bedroom semi-detached dwellings and all associated works. Permission is also sought to complete 5 no. commenced houses as follows: complete 4 no. two story three bedroom dwellings with proposed alterations to layout and design of same, permission to complete roads and services to same , permission to complete 1 no detached 4 bedroom dwelling with proposed alternation to layout and design of same, permission to complete roads and services to same, and all associated site works.
Core Refusal Reason
The application for an Extension of Duration was refused on procedural grounds because the response to a further information request was submitted outside the mandatory 4-week statutory timeframe.
Decision Maker's Conclusion
- The applicant failed to comply with the statutory requirements of Article 45(3) of the Planning & Development Regulations 2001 (as amended).
- A further information response was received by the Planning Authority on 22nd September 2022, which fell outside the required 4-week response period.
- As the application was not in accordance with the procedural requirements of Article 45 of the Regulations, the Planning Authority determined that the extension must be refused.