22829

installation of footpaths and public lighting , consisting of works as follows (a) regrading of verges, vegetation clearance and tree felling as required (b) construction of about 410m of concrete kerb and macadam footpaths varying from 1.5 - 1.8m in width (c) reducing roadway width to 6.0m on straight sections and 6.5m on curves, including widening of existing concrete footpath. Existing width on hairpin bend maintained. (d) install cable ducts, maximum 6m high lighting columns and S2 class lighting. (e) Install an advisory pedestrian crossing and ancillary warning signs on the route (f) new road surface over lay and landscaping disturbed ground at completion of other civil works

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.