22848

(a) Five detached 5-bedroom two storey detached dwellings along with the provision of individual surface water soakaway to meet BRE Digest 365 standards for each dwelling house. (b) provision of new vehicular entrance off main road providing for sufficient traffic sight lines onto public road along with all necessary ancillary and site works to facilitate this development (c) provision of internal road network servicing the development with new landscaped public park and green areas with new pedestrian and cycle paths whilst providing hard and soft landscaping within the development along with all associated site development , new boundary treatments and landscaping works (d) proposed connection of each of four dwellings to individual proposed waste water treatment systems and percolations areas to meet current EPA standards until such time that Newcastle waste water treatment plant has been upgraded and then the 4no. houses shall be connected into Newcastle waste water treatment plant and the individual waste water treatment systems shall then be decommissioned. (f) installation of an underground storm water attenuation tank and connection to all public services an utilities

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.