22860

slope stability remediation works on the sloped landscape areas to the north of the existing house and adjoining coach house, between the house and the River Dargle, as outlined on the planning application drawings. Works to include removal of existing trees and vegetation, slope regarding, soil nailing, construction of stone-filled gabion facing, foundations, drainage, underpinning and rebuilding of existing damaged walls, replanting of vegetation; Mount Herbert is listed as a Protected Structure, No. B20

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.