22971

to Extend the Appropriate Period of Planning for P17/685 Part demolition, modification and renovation of an existing dwellinghouse, conversion of existing stable buildings to residential use including two extensions, Replace the existing metal roof on the Coach House with a traditional slate roof. Upgrading of existing entrance road and Main entrance on the R463 public road. Upgrading of existing Wastewater treatment system with installation of a new P6 Advanced Aeration waste water treatment unit and pumped dripfeed infiltration system, to cater for 4 bedroom accommodation capacity. The Buildings are within the curtilage of a protected structure. Repairs and maintenance works to existing stone bridge and open drains and culverts within the curtilage of the dwelling and all associated site works

Refused

Core Refusal Reason

The application failed to meet the statutory requirements of Section 42(1)(a)(i) of the Planning and Development Act 2000 (as amended) as the development had not commenced and no substantial works were carried out prior to the expiration of the original permission.

Decision Maker's Conclusion

  • The development permitted under P17/685 has not commenced, and the applicants' stated intention to start construction in June 2023 falls after the expiration of the original appropriate period.
  • No substantial works were carried out pursuant to the original planning permission during its appropriate period as required by legislation.
  • The Planning Authority is not satisfied that the application complies with the mandatory criteria set out in Section 42(1)(a)(i) of the Planning and Development Act 2000 (as amended) for extending the duration of a permission.

Cited Policies (CDP)

Decision Document Summary

Gary and Michelle McNamara applied to extend the duration of planning permission P17/685, which involved the renovation and extension of a dwelling and conversion of stables at Tinarana, Rahena Beg, Ogonnelloe, Co. Clare. The Planning Authority refused the extension because the applicants confirmed that no works had been carried out to date and construction was not planned to begin until after the original permission's expiry date. As the development had neither commenced nor seen substantial wo...