SECTION 5 DECLARATION: INSTALLATION OF ROCK ARMOUR MATERIALS TO THE RIVERBANKS OF THE OWENMORE RIVER AT 2 LOCATIONS EACH MEASURING APPROXIMATELY 200M IN LENGTH TO PREVENT FURTHER EROSION OF THE EXISTING BANKS