2252057

(1) ERECTION OF (A) UP TO 32 CONTAINERS TO HOUSE LITHIUM-ION BATTERIES OR SIMILAR TECHNOLOGY CIRCA 14.0M LENGTH, 2.44 WIDE AND 2.9 HIGH FOR ELECTRICITY STORAGE (B) A HARDSTAND COMPOUND AREA SURROUNDED BY A 2.6M HIGH PALISADE FENCE (C) BATTERY ENERGY STORAGE SYSTEM (BESS) CONTROL BUILDING (D) SYNCHRONOUS CONDENSER COMPOUND COMPRISING OF A HORIZONTAL SYNCHRONOUS GENERATOR POSITIONED WITHIN A BUILDING, CONTROL BUILDING AND AIR COOLING (E) INTERNAL CABLE TO CONNECT THE FACILITY TO THE EXISTING CLOGHER 110KV SUBSTATION (2) GRID CONNECTION WILL BE VIA THE EXISTING 110KV CLOGHER SUBSTATION (3) OTHER ANCILLARY INFRASTRUCTURE AT THE COMPOUND CONSISTING OF CCTV POLES, PARKING FACILITIES AND LIGHTING. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.