22369

development consisting of the development of a battery energy storage system. The development will consist of a 10 year planning permission for the construction of a: (1) enclosed battery energy storage system compound on a total of up to c. 1.7 hectare site, to include: 1 no. single storey customer substation and 1 no. TSO substation (c. 182m2), control and switch rooms, up to 174 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), transformer and inverter units. Including access tracks and site entrance along with upgrade works on the public roads (c.800m), associated electrical cabling and ducting, security gates, palisade perimeter security fencing (c. 2.6m height), CCTV system, landscaping works and all associated ancillary infrastructure. The total development area including the area of public road improvements is c.2.3 hectares. A Natura Impact Statement has been prepared for this proposed development to assess and mitigate any potential ecological impacts

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.