22485

development consisting of the construction (1) of a part single storey / part two storey factory development incorporating chilling, plucking and processing areas, offices, plant rooms, lairage and loading and unloading areas, canteen and hygiene facilities and single story conveyor linkage to existing factory facility (2) single storey skip storage and plant room (3) construction of 2 no. underground water storage tanks, (4) a single storey extension to the side of existing storage shed to incorporate an offal processing facility with permission being sought for the change of use of the existing storage shed for use as an offal processing facility, (5) provision of additional car parking facilities, security fencing and access roads, (6) connection to existing on-site mains foul sewer, water, and drainage services, (7) partial removal of existing concrete yard areas and associated structures, (8) installation of solar panels to roofs of structures, (9) construction of underground attenuation drainage system, (10) completion of all associated site structures and ancillary site works including a treated effluent wastewater drip irrigation system encompassing 9 plots of land spread over c15 hectares with a total disposal volume of up to 480m3 per day. The application relates to a development which comprises an activity that holds an IED (Industrial Emissions Licensing) license from EPA (Environmental Protection Agency), an EIAR (Environmental Impact Assessment Report) and an AASR (Appropriate Assessment Screening Report) have been submitted as part of this application. Significant further information received in relation to revised E.I.A.R report, revised site layout plan and revised site boundaries,

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.