221175
for the development consisting of a wind energy development comprising of one electricity generating wind turbine, with an overall blade tip height of up to 168m, construction of c. 150m of permanent access track, 110m of temporary access track, road widening works along the existing local access road from the R327 to the proposed site access track, a crane hardstand, a 20kV substation, site electrical & fibre optic cabling & ancillary site works. The maximum output capacity of the wind farm will be c.4.8MW. This application is seeking a 10 year permission & a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by Natura Impact Statement (NIS)
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original