2261271

for the replacement of an existing 15 metres telecommunications stayed support structure with attached equipment with a proposed new 18 metre monopole support structure (overall height of 19 metres) carrying equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new ground equipment cabinets and all associated site works.

Granted

Core Planning Reasoning

The proposed development is considered to be in accordance with the proper planning and sustainable development of the area as it provides essential telecommunications infrastructure on an established utility site, complies with national guidelines, and does not significantly impact the visual amenities or architectural heritage of the locality.

Decision Maker's Conclusion

  • The principle of development is acceptable given the site's brownfield status and long-standing use as a telecommunications utility within the curtilage of an Eir exchange.
  • The 18-metre monopole structure is technically justified to address local 5G coverage blackspots and to facilitate mandated co-location for multiple network operators.
  • Visual and heritage impacts are mitigated by the slimline design of the structure and the retention of mature deciduous tree screening, ensuring no significant adverse impact on the nearby Protected Structures or the sensitive Class 3 landscape.

Cited Policies (CDP)

ICT 2-National Broadband PlanICT 3-Telecommunications Antennae and Support StructuresICT 4-Co-location of antennaeICT 5-Siting and Design of Telecommunications InfrastructureICT 6-Visual Impact and Antennae Support StructuresSection 7.8.2 (Telecommunications)Section 8.13 (Landscape)LCM 1-Preservation of Landscape CharacterLCM 2-Landscape Sensitivity ClassificationLCM 3-Landscape Sensitivity RatingsSection 12.5 (Architectural Heritage)AH 1-Architectural HeritageDM Standard 42: Telecommunications Masts

Decision Document Summary

This report assesses a third-party appeal against the grant of permission for a telecommunications upgrade at the Eir Exchange in Letterfrack, Co. Galway. The proposal involves replacing an existing 15m stayed lattice mast with a new 18m monopole (19m overall height) and associated ground equipment. Residents raised concerns regarding visual impact in a sensitive landscape, proximity to a pre-school and Protected Structures, and potential health effects. The Inspector found that national policy ...