2334

RELOCATE A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE DINGLE INCH 38KV LINE. THE RELOCATION IS REQUIRED DUE TO THE CONSTRUCTION OF A DWELLING HOUSE ( PLANNING REFERENCE 22/562) IN CLOSE PROXIMITY TO THE LINE. THE ALTERATION CONSISTS OF DIVERTING THE LINE AROUND THE PROPOSED DWELLING WITH FIVE NEW PORTAL STRUCTURES AND RETIRING THREE EXISTING PORTAL STRUCTURES. THE AFFECTED LINE SECTION IS 494M.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.