for the development consisting of the restoration of an area of a disused Sand and Gravel Pit, back to agriculture use. The proposed site covers approx 6.4 hectares and approx 116,000 cubic metres (185,600 tonnes) of uncontaminated soil and stone is to be imported under a waste facility permit over a period of 8 to 10 years. A maximum of 5 loads per day will be delivered to the facility Monday to Friday, no waste will be accepted at the weekend or on bank holidays. The maximum annual tonnage to be accepted will be 20,000 tonnes so an EIAR is not required.