the restoration and stabilisation of approximately 170m of riverbank along the Owenmore River where erosion has occured. These works will include the placement of rock armour stone to the lower sections of riverbank, and soft engineering measures to the upper sections of riverbank. The soft engineering measures will include the installation of coir/jute matting and re-vegetation works. A NIS has been submitted.

Granted