2260739
to revise the location of the existing site entrance to a location further East on the same site. The opening for the revised entrance location further to the East currently exists but is not used other than periodically by the ESB to access an ESB substation by means of a legal Right of Way. Permission is therefore sought to retain the existing opening and to revise it to accommodate the change of use from periodic ESB use to it being in daily commercial use as the sole site entrance in place of the existing site entrance further to the West which will be blocked, together with all associated site works.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original