2319
construction of new site entrance and access road, upgrade of existing footpath with tactile pavings and dropped kerbs, partial demolition of existing boundary wall to allow proposed site entrance, soakaway for surface water drainage and all associated site works. The proposed site entrance will replace the existing site entrance due to poor vehicular sightlines
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.